This month we have been busy installing containment, cabling and connections on site for the main LV supply from the local transformer. All tasks were completed in house by IES in a timely fashion and the guys have made a lovely installation once again.
The installation included multiple 630mm CSA AWA single core cables for each phase and neutral onsite all designed and specified by IES.
The LV switchboard was supplied by Morris line engineering who have been a pleasure to work with on this project from start to Finish.
Today we successfully tested the installation and energised the Transformer LV ACB supplying power to our LV switchboard which is a great milestone for this ongoing project.
Keep up the great efforts guys.